CRYO ARCHIVE - Stuck between coffens after sliding - cant get out, had to stay there all game.

• Bungie Account Name : Elupsis#9272
• Platform - Steam

• Description of Issue - After sliding along the room wall, between the wall and the "suspended coffens", my character was stuck and I couldn't escape or snuggle my way out, teammates couldn't help. Disconnecting and reconnecting to the game didn't resolve the issue.

• VIDEO -
My character stuck : https://youtu.be/oWHTREgq46w 

Side note: Warframe as a /unstuck command for this kind of situation, that tp the player to the closest area. I don't believe it can be used to tp oneself or exploit this command for it might check the status of the player before tp-ing them. (from what I recall from personnal experience.)
video of Warframe /unstuck command here : https://www.youtube.com/watch?v=x1FhA_rxG1Q

• Rough Date and Time of issue
- 03 04 2026 - around midnight (GMT +2)

• Repro steps - Run along the way close to the wall, not in the hallway but rather between the wall and the coffens (the tight gap, see bellow), slide when close to the coffens.

Map Location : (my character was on C3 ping)

0

Комментарии

1 комментарий
  • Официальный комментарий

    Hey there,

    Thank you for your detailed report.

    We have taken note of your report of where you got stuck in Cryo Archive. We will be sure to investigate this on our end. Thanks again for the heads up!